Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
equipment:metalshop:expansion2026 [2026/06/17 08:51] robert.simpson190equipment:metalshop:expansion2026 [2026/06/17 09:00] (current) robert.simpson190
Line 20: Line 20:
   * <del>Move CNC into position.</del> Done   * <del>Move CNC into position.</del> Done
   * <del>Move lathe into position.</del> Done 16-April-2026. Note the lathe now has the new access system.   * <del>Move lathe into position.</del> Done 16-April-2026. Note the lathe now has the new access system.
-  * <del>Decide on how to build partition next to lathe.</del> Will be a stud wall 8ft wide (to match available panel sizes), floor to ceiling+  * <del>Decide on how to build partition next to lathe.</del> Will be a stud wall 8ft wide (to match available panel sizes), floor to ceiling. Made from 100x50 CLS. Verticals 400mm spacing. Noggins positioned to match where we're going to attach bins etc. TBD: What type of panels? Plasterboard or OSB?
   * Build partition.   * Build partition.
   * Install curtain in new position.   * Install curtain in new position.
  • equipment/metalshop/expansion2026
  • Last modified: 2 days ago
  • by robert.simpson190