Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| manual:proposals [2023/02/12 12:56] – matt | manual:proposals [2026/07/10 12:47] (current) – matt | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Proposals ====== | ====== Proposals ====== | ||
| - | Proposals are our system for putting forward and agreeing changes to the space. It covers buying, adopting, or upgrading tools, equipment, and infrastructure. | + | Following |
| - | + | ||
| - | ===== Types of Proposal ===== | + | |
| - | + | ||
| - | There are three types of proposal. They require different levels of support based on their cost and complexity. | + | |
| - | + | ||
| - | ^Proposal Type ^Qualifying Criteria ^ Director' | + | |
| - | |Micro | Costs up to £60 / A new risk assessment is not required / A new space does not have to be made | 2 Directors | 4 Members | | + | |
| - | |Small | Costs up to £600 | Majority of Directors | 12 Members | | + | |
| - | |Large | n/a | Majority of Directors | Passes | + | |
| - | + | ||
| - | ===== Proposals Process ===== | + | |
| - | + | ||
| - | To make a proposal, start a thread in the proposals | + | |
| - | + | ||
| - | To pass, a proposal must receive a sufficient level of support from members and directors. Directors should judge their support on the the following criteria: Cost, safety, space availability, | + | |
| - | + | ||
| - | For micro and small proposals, support should be voiced in the forum thread for that proposal. | + | |
| - | + | ||
| - | For large proposals, support is measured at a General Meeting vote. | + | |
| - | + | ||
| - | when a proposal attains a sufficient level of support, it is considered to have passed, and the proposer can go ahead with their proposal. | + | |
| - | + | ||
| - | If a proposal is altered in any way after support has been given, that support must be given again to qualify. | + | |